What should I pay attention to after rope saw cutting?
After the Rope saw cutting down all kinds of materials should be promptly cleaned up, classified stacked in designated places, the superstructure la keb should be set up string tube dumping, not at will from the height of the throw, and timely clearance. The removed materials and construction waste should be cleared in time. The removed material should be placed in the vertical lifting equipment or discharge chute. Construction waste shall be discharged by garbage well. Demolition construction should be carried out in sections, not vertical cross work.
The holes in the working surface should be closed. Do not gather or pile materials on the floor. When dismantling the beam, should ensure that the effective control of its fall, can be cut off at both ends of the steel, slowly down end by end. When the pillar is removed, the steel bar shall be cut out along the bottom of the pillar, and then the manual reverse chain directional traction shall be used. The steel bar on the three sides of the pillar shall be cut by gas welding, and the steel bar on the front side of the traction direction shall be retained. When removing pipelines and containers, the types and chemical properties of residues must be found out, and corresponding measures must be taken before the demolition can be carried out.
Hard Rock Cutting CNC Automatic Diamond Wire Saw Machine 55kw
Shock! The first Chinese 3D printing wire saw machine was born in Kanghua
Kanghua Wire Saw Machine in Moscow Stone Fair
Hot Sale Wire Saw Stone Quarry Cutting Machine
High Quality Wire Saw Cutting Machine for Quarrying
Diamond Wire Saw Mining Stone Cutting Machine
Granite Diamond Wire Saw Machine for Quarry Stone
Diamond Wire Cutting Rope Saw Machine
Granite and Marble Block Wire Saw Cutter Machine